Difference between Quality Assurance and Quality Control

By | January 2, 2016

Difference between Quality Assurance and Quality Control

Noor Ahmed Raaz
Specialized in Apparel Manufacturing
Owner and Editor in chief Textile Merchandising
Asst. Prof., Department of Textile Engineering
Atish Dipankar University of Science & Technology
Email: mnnabi@adust.edu.bd

Introduction:

We know every manufacturing products quality is very important. Without best quality the product or goods not accepted. So we need to ensure the best quality of products. Although quality assurance and quality control are closely related concepts, and are both aspects of quality management. For this reason, the necessity of the “Quality’ in the whole manufacturing process is a must. So, today I would like to discuss about this about quality assurance, quality control and also their difference.

Quality Assurance:

Quality assurance means with need of customer demand, that means a sample or substance will be bulk products as like a sample or equivalent of the sample. A quality assurance system is said to increase customer confidence and a company’s credibility, to improve work processes and efficiency, and to enable a company to better compete with others. In developing products and services, quality assurance is any systematic process of checking to see whether a product or service being developed is meeting specified requirements.

Quality Assurance

Quality Control:

Quality is almost similar to the quality assurance, but it is a technical process where confirming product quality and standard by quality control team. quality control is a package of activities for maintaining and ensuring products quality and standard. Generally the activities of quality control are done after the production process.

Quality Control

Different between Quality Assurance and Quality Control:

Basically, quality control and quality assurance are two elements of quality management. But sometimes those elements makes a little bit of a mix-up about the differences between quality assurance and quality control. For this reason, here given a brief difference between quality assurance and quality control.

S/L
Comparison
Quality Assurance
Quality Control
01
Definition
Quality assurance is a continuous set of process where monitoring on process production.
Quality control is a technical process where confirming
product quality and standard.
02
Responsibility
Quality assurance is the responsibility of the whole team.
Quality control is the responsibility only quality team.
03
Activity
Quality assurance can easily find out process faults or error. On the other hand QC process can’t
find out whole results. Therefore, this process is known as low level
activity.
Here, to find out correct error or mistake for need more
examination. Therefore, this process is known as high level activity.
04
Aim
The main aim of QA is preventing production defect.
The main aim of QA is identify production defect.
05
Start point
Quality assurance started before production.
Quality control is started after production.
06
Process
Quality assurance is process of verification.
Quality control is process of Validation.
07
Controlling
Quality assurance controlling the required quality.
Quality control controlling in time of production.
08
Method
Quality assurance is the method of managing for quality.
Quality control is the method of verify the quality up to output.
09
Time consuming
Quality assurance is not measured as a time consuming activity.
Quality control is measured as a time consuming activity.
10
Tool
Quality assurance is consider as a executive tool.
Quality control is consider as a corrective tool.

Leave a Reply